Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Kühtailelift

Mountain station
Mountain station

Mountain station
Mountain station

Line
Line

General information  
Place Oetz 
resort Hochoetz 
Region Tyrol 
Country   
Name of lift Kühtailelift 
Type 3-CLF 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date 2001 
Date of closing down 2022 
Date of pull down 2022 
Second-hand lift. Formerly lift no. 4651 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift from Sölden (former Langeggbahn I)

geometric data  
Height of valley station 1840 m
Height of mountain station 2071 m
Vertical rise 231 m
Route distance 726 m
Horizontal length ?? m
Average incline 33,72 %
Largest incline 44,58 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1965 Pers/h
Travel time 5,5 min
Driving speed line 2,2 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system Elin 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 265 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type gas engine 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 122 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer Austria Draht 
Length of haul rope 1452 m
Total weight of haul rope 7,8 t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 3,5 months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19/01/24
PHOTOS: ??

Lift-Statistics
17197 visit(s) since 30/12/02
Last visit 18/04/24

LIFT-WORLD IDs
Lift-ID: 1572
Place-ID: 14

https://www.seilbahntechnik.net/en/lifts/1572/datas.htm