  6-CLD Kappe










General information  
Place Winterberg 
resort ?? 
Region North Rhine-Westphalia 
Country   
Name of lift Kappe 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2013 
Commissioning date 24/12/13 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 603 m
Height of mountain station 782 m
Vertical rise 179 m
Route distance 562 m
Horizontal length ?? m
Average incline ?? %
Largest incline 50 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2700 Pers/h
Travel time 2,7 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 40 Stk
Cab distance 36 m
Cab interval 8 s
Garage type station circulation 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 14 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28/10/18
PHOTOS: ??

Lift-Statistics
13408 visit(s) since 18/12/13
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 17138
Place-ID: 1985

https://www.seilbahntechnik.net/en/lifts/17138/datas.htm