Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  120-AT Seilbahn Zugspitze










General information  
Place Garmisch-Partenkirchen 
resort Zugspitze 
Region Bavaria 
Country   
Name of lift Seilbahn Zugspitze 
Type 120-AT 
Lift manufacturer Garaventa 
Year of construction 2017 
Commissioning date 21/12/17 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 998,50 m
Height of mountain station 2943,75 m
Vertical rise 1945,25 m
Route distance 4466,90 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 1 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 10 m
Trackwidth line 18,6 m
Trackwidth return 12,6 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 580 Pers/h
Travel time ?? min
Driving speed line 10,6 m/s
Speed on towers 8,5 m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 1800 kW
Drive power (Operation) 900 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model ?? 
Heater yes 
Aircon no 
Persons per cab 120 
Number of cabs 2 Stk
Carriage Operator yes 


rope data  
Rope manufacturer Fatzer 
Length of carrying rope 4900 m
Length of traction rope ?? m
Length of counter-rope ?? m
Total weight of carrying rope 153 t
Total weight of traction rope 39 t
Total weight of counter-rope 30 t
Carrying rope diameter 72 mm
Traction rope diameter 47 mm
Counter-rope diameter 41 mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation carryingrope Valley station 
Tensionstation tractionrope Mountain station 
Tension type rope tension weight 
Tension way 12 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 30 months
Seasontime ❄ ☀ all-season 
xxxx hier text hin xxxx yes 
Moving platform no 
Evacuation ropeway yes 
Integrated rescue system yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 13/10/18
PHOTOS: ??

Lift-Statistics
11977 visit(s) since 26/11/17
Last visit 19/04/24

LIFT-WORLD IDs
Lift-ID: 18448
Place-ID: 157

https://www.seilbahntechnik.net/en/lifts/18448/datas.htm