Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Alpkogelbahn

Valley station
Valley station

Mountain station
Mountain station

Pylone
Pylone

General information  
Place Galtuer 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Alpkogelbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2004 
Commissioning date 2004 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1642 m
Height of mountain station 1974 m
Vertical rise 332 m
Route distance 1399 m
Horizontal length 1355 m
Average incline 24,5 %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,03 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 539 kW
Drive power (Operation) 438 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA III-8 LWI 
Seating ?? 
Seat heater ?? 
Heater no 
Aircon no 
Persons per cab
Number of cabs 32 Stk
Cab distance 87,48 m
Cab interval 14,58 s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/04/22
PHOTOS: ??

Lift-Statistics
23490 visit(s) since 10/03/05
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 5053
Place-ID: 28

https://www.seilbahntechnik.net/en/lifts/5053/datas.htm