Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Almbahn

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Ellmau 
resort ?? 
Region Tyrol 
Country   
Name of lift Almbahn 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1999 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1218 m
Height of mountain station 1525 m
Vertical rise 307 m
Route distance 1129 m
Horizontal length ?? m
Average incline 28,70 %
Largest incline 50,00 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2700 Pers/h
Travel time 3,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 6E98/A 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 62 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) 98 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/05/23
PHOTOS: ??

Lift-Statistics
22093 visit(s) since 30/09/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 106
Place-ID: 74

https://www.seilbahntechnik.net/en/lifts/106/datas.htm