Lift-Database » Lifts in the world

  6-CLD Tschein

Valley Station
Valley Station

Mountain Station
Mountain Station

Line
Line

General information  
Place Welschnofen 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Tschein 
Type 6-CLD 
Lift manufacturer Leitner 
Year of construction 2014/20 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
route extension in 2020

geometric data  
Height of valley station 1572 m
Height of mountain station 1981 m
Vertical rise 409 m
Route distance 2204 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 (2000) Pers/h
Travel time 6 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 441 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Leitner 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 74 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 44 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime winter 
Situation of entrance ?? 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 404 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19/12/21
PHOTOS: ??

Lift-Statistics
13084 visit(s) since 16/11/14
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 17695
Place-ID: 1662