Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-AT Eierschwand - Rüegig



General information  
Place Bürglen 
resort ?? 
Region Uri 
Country   
Name of lift Eierschwand - Rüegig 
Type 4-AT 
Lift manufacturer Niederberger 
Year of construction 1978 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1011 m
Height of mountain station 1731 m
Vertical rise 720 m
Route distance 2155 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 5 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 26 Pers/h
Travel time ?? min
Driving speed line ?? m/s
Speed on towers ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 2 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer ?? 
Length of carrying rope ?? m
Length of traction rope ?? m
Length of counter-rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Total weight of counter-rope ?? t
Carrying rope diameter ?? mm
Traction rope diameter ?? mm
Counter-rope diameter ?? mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation carryingrope ?? 
Tensionstation tractionrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
xxxx hier text hin xxxx ?? 
Moving platform ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19/04/20
PHOTOS: ??

Lift-Statistics
1507 visit(s) since 25/04/20
Last visit 06/10/24

LIFT-WORLD IDs
Lift-ID: 19398
Place-ID: 2333

https://www.seilbahntechnik.net/en/lifts/19398/datas.htm