  10-MGD König Laurin 1



General information  
Place Welschnofen 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift König Laurin 1 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2020 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1748 m
Height of mountain station 2000 m
Vertical rise 252 m
Route distance 869 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 (2400) Pers/h
Travel time 2,5 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 486 kW
Drive power (Operation) 386 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D5000 
Cab manufacturer CWA 
Cab model Omega V - 10 
Seating ?? 
Seat heater ?? 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 21 (28) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ?? 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/04/23