Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Plattenkogel X-press 1

Line
Line

Line
Line

Line
Line

General information  
Place Krimml 
resort ?? 
Region Salzburg 
Country   
Name of lift Plattenkogel X-press 1 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1474 m
Height of mountain station 1723 m
Vertical rise 249 m
Route distance 963 m
Horizontal length ?? m
Average incline 26,8 %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,2 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 483 kW
Drive power (Operation) 388 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 48 Stk
Cab distance 60 m
Cab interval 12 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 20 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/04/23
PHOTOS: ??

Lift-Statistics
27994 visit(s) since 27/01/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 422
Place-ID: 439

https://www.seilbahntechnik.net/en/lifts/422/datas.htm