Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Armoise

L\'armoise
L\'armoise

Bergstation L\'armoise
Bergstation L\'armoise

Valley Station
Valley Station

General information  
Place Aussois 
resort ?? 
Region Rhône-Alpes 
Country   
Name of lift Armoise 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2005 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2180 m
Height of mountain station 2610 m
Vertical rise 429 m
Route distance 1587 m
Horizontal length 1512 m
Average incline 28 %
Largest incline 91 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,0 m
Trackwidth line 6,0 m
Trackwidth return 6,0 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 5,03 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 496 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type A108C 
Cab manufacturer Doppelmayr 
Cab model 6E98 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 69 Stk
Cab distance ?? m
Cab interval ?? s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 33 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/03/22
PHOTOS: ??

Lift-Statistics
7174 visit(s) since 07/11/05
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 8444
Place-ID: 954

https://www.seilbahntechnik.net/en/lifts/8444/datas.htm