Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Valachovka

Valley  station
Valley station

Line
Line

Mountain Station
Mountain Station

General information  
Place Deštné v Orlických horách 
resort ?? 
Region Královehradecký kraj 
Country   
Name of lift Valachovka 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 2006 
Commissioning date 27/12/06 
Date of closing down 28/02/24 
Second-hand lift. Formerly lift no. 3590 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Second hand lift from Malbun (FL)

geometric data  
Height of valley station 666 m
Height of mountain station 874 m
Vertical rise 208 m
Route distance 864 m
Horizontal length 838 m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1350 Pers/h
Travel time 6 min
Driving speed line 2,5 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 164 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type 2FG 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 135 Stk
Cab distance 12,3 m
Cab interval 5 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 31 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? CZK
Currency (Construction costs) Czech koruna 
Construction period 3 months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/03/24
PHOTOS: ??

Lift-Statistics
5868 visit(s) since 28/12/06
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 10807
Place-ID: 1675

https://www.seilbahntechnik.net/en/lifts/10807/datas.htm