  4-CLF Zbojník










General information  
Place Bílá 
resort ?? 
Region Moravskoslezský kraj 
Country   
Name of lift Zbojník 
Type 4-CLF 
Lift manufacturer Doppelmayr 
Year of construction 2006 
Commissioning date ?? 
Date of closing down 23/04/23 
Date of pull down 2023 


Infos for handicapped persons
Sorry, no information available.

Characteristics
The first 4-seater chairlift in Beskydy

geometric data  
Height of valley station 543 m
Height of mountain station 772 m
Vertical rise 229 m
Route distance 821,54 m
Horizontal length 786,90 m
Average incline 29,11 %
Largest incline 61,69 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,80 m
Trackwidth line 4,80 m
Trackwidth return 4,80 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,3 min
Driving speed line 2,6 m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 223 kW
Drive power (Operation) 178 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type 4FG 
Cab manufacturer Doppelmayr 
Cab model 4E98/A Fix 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 107 Stk
Cab distance 15,5 m
Cab interval 6 s


rope data  
Rope manufacturer Fatzer 
Length of haul rope 1669,16 m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? CZK
Currency (Construction costs) Czech koruna 
Construction period 3 months
Seasontime ❄ ☀ all-season 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/04/23
PHOTOS: ??

Lift-Statistics
12612 visit(s) since 28/12/06
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 10808
Place-ID: 228

https://www.seilbahntechnik.net/en/lifts/10808/datas.htm