Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Top Express

Station
Station

Station
Station

Station
Station

General information  
Place Hochgurgl 
resort Obergurgl-Hochgurgl 
Region Tyrol 
Country   
Name of lift Top Express 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 1997 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
connection lift

geometric data  
Height of valley station 2340 m
Height of mountain station 2421 m
Vertical rise 81 m
Route distance 3585 m
Horizontal length ?? m
Average incline 2,26 %
Largest incline 18,09 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 10,0 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 501 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Swoboda 
Cab model ULTRA 8 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 55 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope 7244 m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/02/22
PHOTOS: ??

Lift-Statistics
22827 visit(s) since 05/08/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 1142
Place-ID: 61

https://www.seilbahntechnik.net/en/lifts/1142/datas.htm