Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Senderbahn

Line
Line

Mountain Station
Mountain Station

Line
Line

General information  
Place Haus im Ennstal 
resort ?? 
Region Styria 
Country   
Name of lift Senderbahn 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date 1998 


Infos for handicapped persons
Sorry, no information available.

Characteristics
mountain rope runs on several sections on its own (hold-down) supports

geometric data  
Height of valley station 1336 m
Height of mountain station 1865 m
Vertical rise 529 m
Route distance 1598 m
Horizontal length ?? m
Average incline ?? %
Largest incline 70,00 %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance 112 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1590 Pers/h
Travel time 6,11 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 534 kW
Drive power (Operation) 422 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DT 104 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour neutral 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 84 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 5 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/02/24
PHOTOS: ??

Lift-Statistics
17245 visit(s) since 07/12/02
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 1340
Place-ID: 8

https://www.seilbahntechnik.net/en/lifts/1340/datas.htm