Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Hoher Turm

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Steinach am Brenner 
resort Bergeralm 
Region Tyrol 
Country   
Name of lift Hoher Turm 
Type 2-CLF 
Lift manufacturer Wito 
Year of construction 2001 
Commissioning date 2001 
Date of closing down 15/08/17 
Date of pull down 2017 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1585 m
Height of middle station(s) ?? m
Height of mountain station 2082 m
Vertical rise 497 m
Route distance 1805 m
Horizontal length ?? m
Average incline 28,81 %
Largest incline 50,20 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1196 Pers/h
Travel time 11 min
Driving speed line 2,8 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 250 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 216 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 5 months
Seasontime ❄ ☀ all-season 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/02/24
PHOTOS: ??

Lift-Statistics
14716 visit(s) since 27/11/02
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 1406
Place-ID: 115

https://www.seilbahntechnik.net/en/lifts/1406/datas.htm