Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Kandahar Express

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Garmisch-Partenkirchen 
resort Zugspitze 
Region Bavaria 
Country   
Name of lift Kandahar Express 
Type 4-CLD/B 
Lift manufacturer Leitner 
Year of construction 2009 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
midway unloading

geometric data  
Height of valley station 1170 m
Height of middle station(s) 1511,5 m
Height of mountain station 1707,5 m
Vertical rise 537,5 m
Route distance 1445 m
Horizontal length 1312 m
Average incline 41 %
Largest incline 98 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1700 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 484 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA-M 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour ?? 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 74 Stk
Cab distance 42 m
Cab interval 8,4 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 2900 m
Total weight of haul rope 22 t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 5 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/08/21
PHOTOS: ??

Lift-Statistics
14574 visit(s) since 17/09/09
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 14065
Place-ID: 157

https://www.seilbahntechnik.net/en/lifts/14065/datas.htm