Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Wangs - Maienberg - Furt

Building area
Building area







General information  
Place Wangs 
resort Pizol 
Region St. Gall 
Country   
Name of lift Wangs - Maienberg - Furt 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2009 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 537 m
Height of middle station(s) 1049 m
Height of mountain station 1522 m
Vertical rise 985 m
Route distance 3213 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 12,6 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 690 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model DIAMOND - C8S155 
Seating ?? 
Seat heater ?? 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 54 Stk
Cab distance 141,6 m
Cab interval 23,6 s
Garage type ground floor 
Garage place Middle station(s) 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/07/22
PHOTOS: ??

Lift-Statistics
11511 visit(s) since 17/09/09
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 14074
Place-ID: 2108

https://www.seilbahntechnik.net/en/lifts/14074/datas.htm