Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Bürglalmbahn

Line
Line

Line
Line

Line
Line

General information  
Place Dienten 
resort ?? 
Region Salzburg 
Country   
Name of lift Bürglalmbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2011 
Commissioning date 2011 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1075 m
Height of mountain station 1652 m
Vertical rise 577 m
Route distance 1736 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 1980 (2370) Pers/h
Travel time 5,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system Siemens 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model DCD 6 
Bubble colour orange 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 70 (84) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/01/20
PHOTOS: ??

Lift-Statistics
19438 visit(s) since 30/11/11
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 15490
Place-ID: 232

https://www.seilbahntechnik.net/en/lifts/15490/datas.htm