Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Wetterkreuzbahn

Pylone 8
Pylone 8

Valley Station
Valley Station

Mountain Station
Mountain Station

General information  
Place Oetz 
resort Hochoetz 
Region Tyrol 
Country   
Name of lift Wetterkreuzbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2011 
Commissioning date 2011 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1889 m
Height of mountain station 2272 m
Vertical rise 383 m
Route distance 1086 m
Horizontal length ?? m
Average incline 38,56 %
Largest incline 98,12 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,97 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 480 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 6E98/B 
Bubble colour ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 53 Stk
Cab distance 45 m
Cab interval 9 s
Garage type underground 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 2359 m
Total weight of haul rope 27 t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 4 m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/02/21
PHOTOS: ??

Lift-Statistics
14935 visit(s) since 30/11/11
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 15504
Place-ID: 14

https://www.seilbahntechnik.net/en/lifts/15504/datas.htm