Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Resterhöhe

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Mittersill 
resort ?? 
Region Salzburg 
Country   
Name of lift Resterhöhe 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2011 
Commissioning date 2011 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1273 m
Height of mountain station 1779 m
Vertical rise 506 m
Route distance 1528 m
Horizontal length 1443 m
Average incline 35 %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,6 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 623,60 kW
Drive power (Operation) 527,59 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 75 Stk
Cab distance 45 m
Cab interval 9 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 3 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) G1 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28/10/23
PHOTOS: ??

Lift-Statistics
14542 visit(s) since 02/12/11
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 15523
Place-ID: 56

https://www.seilbahntechnik.net/en/lifts/15523/datas.htm