Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Hahnenkammbahn

Line
Line

Line
Line

Line
Line

General information  
Place Kitzbuehel 
resort ?? 
Region Tyrol 
Country   
Name of lift Hahnenkammbahn 
Type 6-MGD 
Lift manufacturer Girak-Garaventa 
Year of construction 1996 
Commissioning date 1996 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 786 m
Height of mountain station 1662 m
Vertical rise 878 m
Route distance 2413 m
Horizontal length ?? m
Average incline 40 %
Largest incline 88 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 7,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 1142 kW
Drive power (Operation) 930 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type Nockenklemme Typ B 
Cab manufacturer CWA 
Cab model ?? 
Seating leather 
Seat heater yes 
Heater no 
Aircon no 
Persons per cab
Number of cabs 98 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 4 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) A1 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/03/24
PHOTOS: ??

Lift-Statistics
36254 visit(s) since 26/11/02
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 1564
Place-ID: 51

https://www.seilbahntechnik.net/en/lifts/1564/datas.htm