Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Brunnenkopfbahn

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Oetz 
resort Hochoetz 
Region Tyrol 
Country   
Name of lift Brunnenkopfbahn 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Bottom station length: UNI-G M
Top station length: UNI-G S

Sheave type 401.

geometric data  
Height of valley station 1960 m
Height of mountain station 2174 m
Vertical rise 214 m
Route distance 658 m
Horizontal length ?? m
Average incline 35 %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5,20 m
Trackwidth line 5,20 m
Trackwidth return 5,20 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2320 Pers/h
Travel time 2,19 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system Elin 
Number of drive 1 Stk
Drive power (Start) 315 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 104G 
Cab manufacturer Doppelmayr 
Cab model 4E98 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 48 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 1400 m
Total weight of haul rope 6,4 t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/04/22
PHOTOS: ??

Lift-Statistics
15991 visit(s) since 16/03/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 1575
Place-ID: 14

https://www.seilbahntechnik.net/en/lifts/1575/datas.htm