Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Alp Trider Sattelbahn


Carpet
Carpet

Valley station
Valley station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Samnaun
resort Silvretta Arena

Region Grisons
Country CH Switzerland, Confoederatio Helvetica
Name of lift Alp Trider Sattelbahn 
Type 6-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2000 
Commissioning date 2000

geometric data  
Height of valley station 2276 m
Height of mountain station 2505 m
Vertical rise 229 m
Route distance 1024 m
Horizontal length ?? m
Average incline 22,4 %
Largest incline 56,8 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 3,4 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 318 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Garaventa
Cab model ??
Bubble colour neutral
Seating leather
Seat heater no
Persons per cab
Number of cabs 60 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Situation of entrance 90°
Situation of exit parallel
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) N6 




This information are for members only visible!



Updates
Datas: 12/03/17 08:05:16
PHOTOS: 12/08/06 14:20:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11177 visit(s) since 16/02/03
Last visit 14/10/19

LIFT-WORLD IDs
Lift-ID: 184
Place-ID: 7

https://www.seilbahntechnik.net/en/lifts/184/datas.htm