Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Légette

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Les Saisies 
resort Espace Diamant 
Region Rhône-Alpes 
Country   
Name of lift Légette 
Type 4-CLF 
Lift manufacturer Skirail 
Year of construction 1998 
Commissioning date 1998 
Date of closing down 2019 
Date of pull down 2019 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1584 m
Height of mountain station 1860 m
Vertical rise 276 m
Route distance 925 m
Horizontal length ?? m
Average incline 29,8 %
Largest incline 61 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1815 Pers/h
Travel time 6,70 min
Driving speed line 2,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 102 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? FRF
Currency (Construction costs) French franc 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/12/19
PHOTOS: ??

Lift-Statistics
4935 visit(s) since 12/01/18
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 18485
Place-ID: 1117

https://www.seilbahntechnik.net/en/lifts/18485/datas.htm