Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Sunnegg

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Damuels 
resort Mellau-Damuels 
Region Vorarlberg 
Country   
Name of lift Sunnegg 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1982 
Commissioning date ?? 
Date of closing down 2014 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1405 m
Height of middle station(s) ?? m
Height of mountain station 1761 m
Vertical rise 356 m
Route distance 904 m
Horizontal length ?? m
Average incline 43,30 %
Largest incline 70,50 %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1440 Pers/h
Travel time 5,0 min
Driving speed line 2,7 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 132 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/10/23
PHOTOS: ??

Lift-Statistics
12316 visit(s) since 21/01/04
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 1875
Place-ID: 38

https://www.seilbahntechnik.net/en/lifts/1875/datas.htm