Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Mittelstation

Valley Station
Valley Station

Valley Station
Valley Station

 Mountain Station
Mountain Station

General information  
Place Sexten / Sesto 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Mittelstation 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2018 
Commissioning date 2018 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1686 m
Height of mountain station 2042 m
Vertical rise 356 m
Route distance 1299 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 (2400) Pers/h
Travel time ?? min
Driving speed line 5 m/s
Driving speed station 1 m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system Leitner 
Power control system Leitner 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 662 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type LPA-M 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 57 (62) Stk
Cab distance 49 m
Cab interval ?? s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) 14 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/03/24
PHOTOS: ??

Lift-Statistics
8501 visit(s) since 06/01/19
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 18832
Place-ID: 1600

https://www.seilbahntechnik.net/en/lifts/18832/datas.htm