Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD GGM-Bahn (Holenstein - Männlichen)





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place
resort Jungfrau
Region Berne
Country CH Switzerland, Confoederatio Helvetica
Name of lift GGM-Bahn (Holenstein - Männlichen) 
Type 10-MGD 
Lift manufacturer Garaventa 
Year of construction 2019 
Commissioning date 14/12/19

geometric data  
Height of valley station 1624 m
Height of mountain station 2223 m
Vertical rise 599 m
Route distance 3036 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 33 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 19 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 918 kW
Drive power (Operation) 677 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type D5000
Cab manufacturer CWA
Cab model Omega V - 10
Seating ??
Seat heater ??
Heater ??
Aircon ??
Persons per cab 10 
Number of cabs 111 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs 35,000,000  CHF 
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 26/03/20 19:34:05
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
400 visit(s) since 02/02/20
Last visit 05/04/20

LIFT-WORLD IDs
Lift-ID: 19128
Place-ID: 1724

https://www.seilbahntechnik.net/en/lifts/19128/datas.htm