Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Gondelbahn Grindelwald Terminal - Männlichen (GGM AG)



General information  
Place Grindelwald 
resort Jungfrau 
Region Berne 
Country   
Name of lift Gondelbahn Grindelwald Terminal - Männlichen (GGM AG) 
Type 10-MGD 
Lift manufacturer Garaventa 
Year of construction 2019 
Commissioning date 14/12/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1624 m
Height of mountain station 2223 m
Vertical rise 599 m
Route distance 3036 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 19 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 918 kW
Drive power (Operation) 677 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D5000 
Cab manufacturer CWA 
Cab model Omega V - 10 
Seating leather 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 111 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place in all stations 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/04/20
PHOTOS: ??

Lift-Statistics
2190 visit(s) since 02/02/20
Last visit 26/03/24

LIFT-WORLD IDs
Lift-ID: 19128
Place-ID: 1724

https://www.seilbahntechnik.net/en/lifts/19128/datas.htm