Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Aualmbahn (Skicabrio Scheffau)










General information  
Place Scheffau 
resort ?? 
Region Tyrol 
Country   
Name of lift Aualmbahn (Skicabrio Scheffau) 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1989 
Commissioning date 1989 
Date of closing down 2014 
Date of pull down 2014 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1388 m
Height of mountain station 1676 m
Vertical rise 288 m
Route distance 1077 m
Horizontal length ?? m
Average incline 28,90 %
Largest incline 57,80 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2880 Pers/h
Travel time 3,9 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 104 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour neutral 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 103 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance 45° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 71 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/02/24
PHOTOS: ??

Lift-Statistics
26776 visit(s) since 04/10/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 1920
Place-ID: 79

https://www.seilbahntechnik.net/en/lifts/1920/datas.htm