Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Skyvall





Infos for handicapped persons
Sorry, no information available.

Characteristics
LPA-XL grips.
Leitner Direct Drive LD10/19.

General information  
Place Peyragudes
resort
Region Midi-Pyrénées
Country FR France
Name of lift Skyvall 
Type 10-MGD 
Lift manufacturer Poma 
Year of construction 2019 
Commissioning date 24/08/19

geometric data  
Height of valley station 965 m
Height of mountain station 1609 m
Vertical rise 644 m
Route distance 3106 m
Horizontal length 3024 m
Average incline 21,30 %
Largest incline 62,70 %
Number of pillars 23 Stk
Greatest spanwidth 211 m
Max ground clearance 22 m
Trackwidth drive 4,90 m
Trackwidth line 6,10 m
Trackwidth return 4,90 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 800 (2000) Pers/h
Travel time 8,6 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope 2060 kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 882 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type ??
Cab manufacturer Sigma
Cab model DIAMOND - C10D210
Seating carpet
Seat heater ??
Heater ??
Aircon ??
Persons per cab 10 
Number of cabs 27 (66) Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs 10,000,000  EUR 
Currency (Construction costs) Euro 
Construction period 10 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 24/05/20 07:29:33
PHOTOS: ????

Lift-Statistics
13 visit(s) since 23/05/20
Last visit 05/06/20

LIFT-WORLD IDs
Lift-ID: 19929
Place-ID: 1166

https://www.seilbahntechnik.net/en/lifts/19929/datas.htm