Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Helmjet

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Sexten / Sesto 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Helmjet 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2020 
Commissioning date 2021 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1320 m
Height of mountain station 2052 m
Vertical rise 732 m
Route distance 2206 m
Horizontal length 2060 m
Average incline ?? %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site 2050 m
Maximum capacity 2400 Pers/h
Travel time ?? min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system Leitner 
Number of drive 1 Stk
Drive power (Start) 1196 kW
Drive power (Operation) 960 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type LPA 
Cab manufacturer Leitner 
Cab model Symphony 10 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 58 Stk
Cab distance 90,6 m
Cab interval ?? s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 58 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) 11 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/05/23
PHOTOS: ??

Lift-Statistics
5222 visit(s) since 08/12/20
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 20457
Place-ID: 1600

https://www.seilbahntechnik.net/en/lifts/20457/datas.htm