Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Štvanice

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place ?? 
resort ?? 
Region Olomoucký kraj 
Country   
Name of lift Štvanice 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2020 
Commissioning date 23/01/21 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 626 m
Height of mountain station 872 m
Vertical rise 246 m
Route distance 984 m
Horizontal length 948 m
Average incline 25,90 %
Largest incline 56,82 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,35 m
Trackwidth line 6,40 m
Trackwidth return 6,35 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site 872 m
Maximum capacity 2550 Pers/h
Travel time 3,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 293 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D3000 
Cab manufacturer Doppelmayr 
Cab model DCD 6 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 53 Stk
Cab distance 42,4 m
Cab interval 8,5 s
Garage type station circulation 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 2029,58 m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? CZK
Currency (Construction costs) Czech koruna 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 03/02/23
PHOTOS: ??

Lift-Statistics
3476 visit(s) since 09/12/20
Last visit 16/04/24

LIFT-WORLD IDs
Lift-ID: 20479
Place-ID: 2559

https://www.seilbahntechnik.net/en/lifts/20479/datas.htm