Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGD Wallowa Lake Tramway



General information  
Place Joseph 
resort Ferguson Ridge 
Region Oregon 
Country   
Name of lift Wallowa Lake Tramway 
Type 4-MGD 
Lift manufacturer Hall 
Year of construction 1968/70 
Commissioning date 1970 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1356 m
Height of mountain station 2484 m
Vertical rise 1128 m
Route distance 3218 m
Horizontal length 2945 m
Average incline ?? %
Largest incline ?? %
Number of pillars 25 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 144 Pers/h
Travel time ?? min
Driving speed line 3,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 110 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model DELUXE 4 
Seating polystyrene 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 21 Stk
Cab distance 315 m
Cab interval 90 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? USD
Currency (Construction costs) United States dollar 
Construction period ?? months
Seasontime summer 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Jun 8, 2025
PHOTOS: ??

Lift-Statistics
988 visit(s) since Apr 7, 2023
Last visit Jun 15, 2025

LIFT-WORLD IDs
Lift-ID: 22314
Place-ID: 3642

https://www.seilbahntechnik.net/en/lifts/22314/datas.htm