Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  125-FUC Rosshütte

Cabin
Cabin

Mountain Station
Mountain Station

Valley Station
Valley Station

General information  
Place Seefeld 
resort Gschwandtkopf 
Region Tyrol 
Country   
Name of lift Rosshütte 
Type 125-FUC 
Lift manufacturer Vöest-Alpine 
Year of construction 1969 
Commissioning date 20/12/69 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1235 m
Height of mountain station 1762 m
Vertical rise 527 m
Route distance 2417 m
Horizontal length ?? m
Average incline 21,40 %
Largest incline 37,20 %
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 5,0 min
Driving speed line 12,0 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Gangloff 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 125 
Number of cabs 2 Stk
Carriage Operator yes 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Length of counter-rope ?? m
Total weight of haul rope ?? t
Total weight of counter-rope ?? t
Haul rope diameter 36 mm
Counter-rope diameter 21 mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 10 months
Seasontime ❄ ☀ all-season 
Type of turnout ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/02/23
PHOTOS: ??

Lift-Statistics
19399 visit(s) since 16/05/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 2551
Place-ID: 113

https://www.seilbahntechnik.net/en/lifts/2551/datas.htm