  6-MGD Grubigsteinbahn I










General information  
Place Lermoos 
resort Lermoos-Biberwier 
Region Tyrol 
Country   
Name of lift Grubigsteinbahn I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1994 
Commissioning date 1994 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 995 m
Height of mountain station 1338 m
Vertical rise 343,1 m
Route distance 1263,75 m
Horizontal length 1209 m
Average incline 28,40 %
Largest incline 50,70 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1624 Pers/h
Travel time 4,4 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control AEG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 459,3 kW
Drive power (Operation) 365,9 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 106 
Cab manufacturer CWA 
Cab model OMEGA 6 fl 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 47 Stk
Cab distance 48,6 m
Cab interval 9,72 s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) L1 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/09/23
PHOTOS: ??

Lift-Statistics
23252 visit(s) since 28/08/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 2852