Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Asitzmuldenbahn

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Leogang 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift Asitzmuldenbahn 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date ?? 
Date of closing down 2018 
Date of pull down 2018 


Infos for handicapped persons
Sorry, no information available.

Characteristics
reposessed to Vent (Wildes Mannle)

geometric data  
Height of valley station 1673 m
Height of mountain station 1872 m
Vertical rise 199 m
Route distance 547 m
Horizontal length ?? m
Average incline 39 %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2455 Pers/h
Travel time 1,91 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 330 kW
Drive power (Operation) 251 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 6E98/A 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 30 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 1250 m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 07/10/22
PHOTOS: ??

Lift-Statistics
19490 visit(s) since 01/03/04
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 2960
Place-ID: 296

https://www.seilbahntechnik.net/en/lifts/2960/datas.htm