Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  1-CLF Sesselbahn Wilder Kaiser II

Bottom Station Lift 2
Bottom Station Lift 2

Way Lift 2
Way Lift 2

Top Station Lift 2
Top Station Lift 2

General information  
Place Kufstein 
resort ?? 
Region Tyrol 
Country   
Name of lift Sesselbahn Wilder Kaiser II 
Type 1-CLF 
Lift manufacturer Swoboda 
Year of construction 1970/15 
Commissioning date 1971 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 894 m
Height of mountain station 1260 m
Vertical rise 366 m
Route distance 1167 m
Horizontal length 1105 m
Average incline ?? %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 309 Pers/h
Travel time 8,6 min
Driving speed line 2,25 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 83 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 90 Stk
Cab distance 25,9 m
Cab interval 11,5 s


rope data  
Rope manufacturer ?? 
Length of haul rope 2334 m
Total weight of haul rope ?? t
Haul rope diameter 24 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 4 months
Seasontime summer 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12/11/23
PHOTOS: ??

Lift-Statistics
17756 visit(s) since 19/03/05
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 312
Place-ID: 466

https://www.seilbahntechnik.net/en/lifts/312/datas.htm