Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Spielbergalmbahn










General information  
Place Gaissau 
resort ?? 
Region Salzburg 
Country   
Name of lift Spielbergalmbahn 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1969 
Commissioning date 1970 
Date of closing down 21/03/22 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Intermediate Station out of order.

geometric data  
Height of valley station 864 m
Height of middle station(s) 1137 m
Height of mountain station 1310 m
Vertical rise 446 m
Route distance 2327 m
Horizontal length 2029 m
Average incline 19,50 %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 870 Pers/h
Travel time 19,4 min
Driving speed line 2,0 m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 264 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type diesel engine 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating duckboard (plastic) 
Seat heater no 
Persons per cab
Number of cabs 230 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 4 months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/11/23
PHOTOS: ??

Lift-Statistics
13618 visit(s) since 10/05/04
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 3157
Place-ID: 248

https://www.seilbahntechnik.net/en/lifts/3157/datas.htm