Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Olympiaexpress










General information  
Place Igls 
resort Patscherkofel 
Region Tyrol 
Country   
Name of lift Olympiaexpress 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1999 
Commissioning date 1999 
Date of closing down 26/03/17 
Date of pull down 27/03/17 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1012 m
Height of mountain station 1742 m
Vertical rise 730 m
Route distance 1881 m
Horizontal length ?? m
Average incline 42,5 %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 6,3 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 104 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 89 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ??  
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12/08/22
PHOTOS: ??

Lift-Statistics
18481 visit(s) since 15/11/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 3162
Place-ID: 141

https://www.seilbahntechnik.net/en/lifts/3162/datas.htm