Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Einzeiger

Valley station
Valley station

Mountain station
Mountain station

Valley station
Valley station

General information  
Place Soelden 
resort ?? 
Region Tyrol 
Country   
Name of lift Einzeiger 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date 1998 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sheave type 401.

Automatic garage.

geometric data  
Height of valley station 2505 m
Height of mountain station 2766 m
Vertical rise 262 m
Route distance 1121 m
Horizontal length ?? m
Average incline 24,80 %
Largest incline 69,70 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,8 m
Trackwidth line 4,8 m
Trackwidth return 4,8 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,7 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system Elin 
Power control system Elin 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DT 104 
Cab manufacturer Doppelmayr 
Cab model 4E98/B 
Bubble colour neutral 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 79 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 8 m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) D 51 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/03/24
PHOTOS: ??

Lift-Statistics
21757 visit(s) since 26/12/02
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 32
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/32/datas.htm