Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Pontresina - Alp Languard

Line
Line

Mountain Station
Mountain Station

Mountain Station
Mountain Station

General information  
Place Pontresina 
resort ?? 
Region Grisons 
Country   
Name of lift Pontresina - Alp Languard 
Type 2-CLF 
Lift manufacturer Poma 
Year of construction 1990 
Commissioning date 20/01/91 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Baco curve
Baco-clamp with Reject hood

geometric data  
Height of valley station 1844,3 m
Height of middle station(s) 1939,8 m
Height of mountain station 2332,31 m
Vertical rise 497,96 m
Route distance 1348,22 m
Horizontal length 1247,25 m
Average incline 38,90 %
Largest incline 67,25 %
Number of pillars 17 Stk
Greatest spanwidth 152, m
Max ground clearance 15 m
Trackwidth drive 3,4 m
Trackwidth line 4,2 m
Trackwidth return 4,2 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site 4 m
Maximum capacity 385 Pers/h
Travel time 14,9 min
Driving speed line 1,5 m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system SISAG 
Power control system SISAG 
Number of drive 1 Stk
Drive power (Start) 155 kW
Drive power (Operation) 131 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model 2E Fix 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 96 Stk
Cab distance 28,3 m
Cab interval 18,8 s


rope data  
Rope manufacturer Drahtseilwerke Brugg 
Length of haul rope 2709,45 m
Total weight of haul rope 10,1 t
Haul rope diameter 33 mm
Nominal strength of haul rope 2060 N/mm²
Breaking strength of rope 761 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 3,75 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime summer 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 20/08/22
PHOTOS: ??

Lift-Statistics
15672 visit(s) since 06/10/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 3430
Place-ID: 393

https://www.seilbahntechnik.net/en/lifts/3430/datas.htm