Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  80-FUC Muottas Muragl




Line
Line

Mountain Station
Mountain Station

General information  
Place Pontresina 
resort ?? 
Region Grisons 
Country   
Name of lift Muottas Muragl 
Type 80-FUC 
Lift manufacturer von Roll 
Year of construction 1907 
Commissioning date 09/08/07 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1739 m
Height of middle station(s) ?? m
Height of mountain station 2448 m
Vertical rise 709 m
Route distance 2201 m
Horizontal length ?? m
Average incline ?? %
Largest incline 54 %
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 550 Pers/h
Travel time 8 min
Driving speed line 5,0 m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Gangloff 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab 80 
Number of cabs 2 Stk
Carriage Operator yes 


rope data  
Rope manufacturer Drahtseilwerke Brugg 
Length of haul rope ?? m
Length of counter-rope ?? m
Total weight of haul rope ?? t
Total weight of counter-rope ?? t
Haul rope diameter ?? mm
Counter-rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period 27 months
Seasontime ❄ ☀ all-season 
Type of turnout ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 20/08/22
PHOTOS: ??

Lift-Statistics
15320 visit(s) since 08/01/04
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 3432
Place-ID: 393

https://www.seilbahntechnik.net/en/lifts/3432/datas.htm