Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Alpen

Mountain Station
Mountain Station

Line
Line

Line
Line

General information  
Place Olang / Valdaora 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Alpen 
Type 6-MGD 
Lift manufacturer Agamatic 
Year of construction 1993 
Commissioning date ?? 
Date of closing down 2013 
Date of pull down 2013 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Re-established in Kemerovo, Russia as 6-MGD Funsport.

geometric data  
Height of valley station 1619 m
Height of middle station(s) 1819 m
Height of mountain station 2152,5 m
Vertical rise 533,50 m
Route distance 2246,28 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 12 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control EEI 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model OMEGA 6 fl 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 119 Stk
Cab distance 15 m
Cab interval 3 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope 4492 m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period 6,5 months
Seasontime ??  
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/05/23
PHOTOS: ??

Lift-Statistics
18717 visit(s) since 31/03/04
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 3876
Place-ID: 1496

https://www.seilbahntechnik.net/en/lifts/3876/datas.htm