Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Hauser Kaibling







Mountain Station
Mountain Station

General information  
Place Haus im Ennstal 
resort ?? 
Region Styria 
Country   
Name of lift Hauser Kaibling 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2000 
Commissioning date 2000 


Infos for handicapped persons
Level walk in

Characteristics
nothing

geometric data  
Height of valley station 729 m
Height of mountain station 1424 m
Vertical rise 695 m
Route distance 2519 m
Horizontal length ?? m
Average incline 28,72 %
Largest incline 53,40 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2395 Pers/h
Travel time 8 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 1045 kW
Drive power (Operation) 830 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DT 108 
Cab manufacturer Swoboda 
Cab model ULTRA 8 S 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 79 Stk
Cab distance 72,15 m
Cab interval 12,02 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 17/11/23
PHOTOS: ??

Lift-Statistics
24002 visit(s) since 03/12/02
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 446
Place-ID: 8

https://www.seilbahntechnik.net/en/lifts/446/datas.htm