Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Muttersbergbahn










General information  
Place Bludenz 
resort Silvretta Nova 
Region Vorarlberg 
Country   
Name of lift Muttersbergbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2002 
Commissioning date ?? 


Infos for handicapped persons
Barrier-free accessible

Characteristics
nothing

geometric data  
Height of valley station 679 m
Height of mountain station 1397 m
Vertical rise 718 m
Route distance 1722 m
Horizontal length ?? m
Average incline 46,50 %
Largest incline 73,0 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1000 Pers/h
Travel time 5,7 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 555 kW
Drive power (Operation) 446 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA III-8 LWI 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 29 Stk
Cab distance 144 m
Cab interval 28,8 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope 3516 m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime summer 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) M1 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/07/22
PHOTOS: ??

Lift-Statistics
30247 visit(s) since 07/05/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 493
Place-ID: 380

https://www.seilbahntechnik.net/en/lifts/493/datas.htm