Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Gipfelbahn Fulseck I

Valley station
Valley station

Valley station
Valley station

Line
Line

General information  
Place Dorfgastein 
resort ?? 
Region Salzburg 
Country   
Name of lift Gipfelbahn Fulseck I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date 2001 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Through operation with Fulseck 2.

geometric data  
Height of valley station 873 m
Height of mountain station 1470 m
Vertical rise 597 m
Route distance 1319 m
Horizontal length ?? m
Average incline 50,73 %
Largest incline 78,60 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,6 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 659 kW
Drive power (Operation) 597 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 106 
Cab manufacturer CWA 
Cab model OMEGA 6s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 53 Stk
Cab distance ?? m
Cab interval 10,8 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ?? 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 36 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/01/24
PHOTOS: ??

Lift-Statistics
25219 visit(s) since 13/04/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 602
Place-ID: 244

https://www.seilbahntechnik.net/en/lifts/602/datas.htm