Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  33-FUT Grand Fond










General information  
Place Val Thorens 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Grand Fond 
Type 33-FUT 
Lift manufacturer Poma 
Year of construction 2001 
Commissioning date 2001 


Infos for handicapped persons
Sorry, no information available.

Characteristics
first Funitel from Poma.

geometric data  
Height of valley station 2462 m
Height of mountain station 3004 m
Vertical rise 542 m
Route distance 1986 m
Horizontal length ?? m
Average incline ?? %
Largest incline 49 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 9,0 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 4,0 min
Driving speed line 7,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 1600 kW
Drive power (Operation) 567 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab 33 
Number of cabs 20 Stk
Cab distance 277,2 m
Cab interval 39,6 s
Garage type station circulation 
Garage place in all stations 
Garage direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope 135 t
Haul rope diameter 51 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12/02/22
PHOTOS: ??

Lift-Statistics
20190 visit(s) since 28/11/02
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 61
Place-ID: 1234

https://www.seilbahntechnik.net/en/lifts/61/datas.htm