Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD Altiport




Valley station
Valley station

Line
Line

General information  
Place Meribel 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Altiport 
Type 8-CLD 
Lift manufacturer Poma 
Year of construction 2000 
Commissioning date 2000 


Infos for handicapped persons
Sorry, no information available.

Characteristics
First 8-CLD in France.

geometric data  
Height of valley station 1718 m
Height of mountain station 1993 m
Vertical rise 275 m
Route distance 1436 m
Horizontal length 1414 m
Average incline 19 %
Largest incline 44 %
Number of pillars 16 Stk
Greatest spanwidth 168 m
Max ground clearance 22 m
Trackwidth drive ?? m
Trackwidth line 7,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3400 Pers/h
Travel time 4,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 500 kW
Drive power (Operation) 500 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type Omega TL 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 74 Stk
Cab distance 42,35 m
Cab interval 8,5 s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/03/23
PHOTOS: ??

Lift-Statistics
16511 visit(s) since 23/11/02
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 65
Place-ID: 1130

https://www.seilbahntechnik.net/en/lifts/65/datas.htm