Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Mottet

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Valmorel 
resort Le Grand Domaine 
Region Rhône-Alpes 
Country   
Name of lift Mottet 
Type 2-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 1978 
Commissioning date ?? 
Date of closing down ?? 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1834 m
Height of middle station(s) ?? m
Height of mountain station 2401 m
Vertical rise 567 m
Route distance 1773 m
Horizontal length ?? m
Average incline 32 %
Largest incline 75 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance 25 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1100 Pers/h
Travel time 12,20 min
Driving speed line 2,5 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 401 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive mechanical 

cabins data  
Grip type ?? 
Cab manufacturer Montaz Mautino 
Cab model ?? 
Seating duckboard (plastic) 
Seat heater no 
Persons per cab
Number of cabs 178 Stk
Cab distance ?? m
Cab interval 6,55 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope 40 t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28/03/16
PHOTOS: ??

Lift-Statistics
10613 visit(s) since 20/08/05
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 6706
Place-ID: 1242

https://www.seilbahntechnik.net/en/lifts/6706/datas.htm