Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  15-MGD Steinplatte










General information  
Place Waidring 
resort 3 Laender Freizeit-Arena 
Region Tyrol 
Country   
Name of lift Steinplatte 
Type 15-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date ?? 


Infos for handicapped persons
At ground level entry.

Characteristics
nothing

geometric data  
Height of valley station 781 m
Height of mountain station 1651 m
Vertical rise 870 m
Route distance 2813 m
Horizontal length 2680 m
Average incline 33,00 %
Largest incline 77,00 %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,0 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2500 Pers/h
Travel time 7,81 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 1200 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type DT 215 
Cab manufacturer CWA 
Cab model CONUS 15 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 15 
Number of cabs 49 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/02/21
PHOTOS: ??

Lift-Statistics
32968 visit(s) since 21/11/02
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 709
Place-ID: 6

https://www.seilbahntechnik.net/en/lifts/709/datas.htm